FAIRWAYS Building Contracting

Turnkey building contractor · UAE · since 2005

G+4 mixed use

From the entrance
to the whole plot

Residential and commercial blocks up to G+4 in concrete or steel. Structure, MEP, façade and fit-out under one contract.

2005Established in Ajman
1,000+Projects delivered
35,000 m²Largest turnkey delivery
6Emirates worked in
ISO ×39001 · 14001 · 45001
What we do

One contractor.
Every trade.
Handover-ready.

One programme, one site team and one point of responsibility, from site mobilisation to the day you take the keys.

A turnkey villa at handover: structure, façade, MEP, landscape and lighting under one contract
Plot to keysA turnkey villa at handover: structure, façade, MEP, landscape and lighting under one contract
Quick answer

FAIRWAYS Building Contracting is a turnkey contractor based in Ajman, UAE, building villas, warehouses and PEB steel buildings, commercial premises and G+4 residential or mixed-use blocks, and carrying out complete renovations and large event sites. Civil works, MEP, aluminium and glazing, interiors, ELV and furniture are delivered by our own teams and group companies under one contract.

The usual way

Civil contractor, MEP subcontractor, façade company, fit-out firm, furniture supplier. Five contracts, four hand-offs, and time and money leak at every one.

The FAIRWAYS way

One contract. Every trade below is run by our own teams and group companies on a single programme.

  • 01Civil & structureFoundations, RC frame, PEB steel
  • 02MEPHVAC, plumbing, power, fire
  • 03Aluminium & glazingCurtain wall, ACP, windows
  • 04Interiors & joineryFit-out, ceilings, millwork
  • 05ELV & securityCCTV, access, networks, AV
  • 06Furniture & handoverFF&E, snagging, O&M manuals

Working this way since 2014 across hotels, duty-free stores, fuel stations, warehouses, villas and offices in six emirates.

Why turnkey

Five contracts
or one?

Split contracts create hand-offs, and hand-offs are where time, money and accountability leak. One turnkey contract puts every trade under one programme and one responsible team.

Split contracts vs one turnkey contract
How a building comes together

Taken apart.
Put back together.

This G+4 block separates into its systems and rebuilds phase by phase. The camera moves into Level 2 for the MEP, visits the ground-floor shops and an apartment as they are fitted out, pulls away like a drone, then the lights come on. Jump with the chapter buttons.

Explore by structure

Five structures.
Same discipline.

Pick a structure: it separates into systems, rebuilds, the camera goes inside as the key deliverables are finished, then out to the landscape and into night. Use the chapter buttons to jump; the Light button switches day and night.

Typical size
400–1,200 m²
Structure
RC frame, block infill
Programme
9–14 months
Includes
Pool, landscape, joinery

Private villas from G to G+2, including boundary walls, pools, hardscape and full interiors.

Explore villa →
Renovation

Cold shell to
consumer-ready.

Drag the slider. A bare concrete unit becomes a finished interior in the order we actually build it: floor, walls, glazing, ceilings and lighting, joinery, then furniture.

  • Occupied buildings phased floor by floor
  • Joinery and furniture made by our group companies
  • MEP upgrades and authority re-approvals handled

Renovation in detail →

Cold shell
Cold shellConsumer-ready
Cold shellBare concrete, exposed services
FlooringEngineered timber floor
Plaster & paintBlock walls plastered and painted
GlazingAluminium frames from our workshop
Ceiling & lightBulkheads, cove light, AC grilles
JoineryKitchen joinery and slat wall
FurnitureSofa, tables and styling
Lights onEvening mood: cove and pendants
What you can expect

Six promises
we build on

Clients come to us for a building. They stay for how it is delivered.

01

One contract, one point of responsibility

Design coordination, approvals, every trade and handover sit with one team. No hand-off gaps, no finger-pointing.

02

A scope and price you can read

A priced bill of quantities against agreed drawings and finishes. Changes go through written variation control before work starts.

03

A programme with milestones

A baseline programme from day one, a three-week look-ahead every week and progress reported against it.

04

Approvals handled

Municipality, Civil Defence and utility submissions prepared, tracked and closed by us, including stage inspections.

05

Quality inspected, not assumed

Material approvals, inspection and test plans and documented sign-off at every stage under ISO 9001.

06

Safe, clean, respectful sites

ISO 45001 safety management, daily toolbox talks, tidy hoarded sites and considerate working for neighbours.

Design & compliance →Quality & safety

How we deliver

Controlled at
every gate

Seven stages, six gates. At every gate the programme, the cost, the quality records and the safety record are checked before the next stage is released.

It is how a single contract stays on time and on budget without cutting corners.

How we manage projects →

Stage gates and the four controls
Selected work

Twenty years
of handovers.

Hotels, duty-free stores, warehouses, fuel stations, villas and offices across six emirates. Full list on the projects page.

StatusProjectSectorScope
2025Turnkey warehouse facility · Northern EmiratesIndustrialLargest single turnkey delivery, 35,000 m²
OngoingRichmond General Trading · Phase 2Commercial / industrialTurnkey
OngoingLeptis SupermarketRetail · steel structureSupermarket and warehouse, PEB
Ongoing30 villas · ACP pergolas · DubaiResidentialAluminium & ACP division
DoneWest Wood Hotel · AjmanHospitalityFit-out and MEP
DoneHoliday Arabian Resort · HattaHospitalityCivil and finishes
DoneFujairah Port Duty FreeRetailTurnkey fit-out
DoneBurJuman Centre renovation · DubaiRetailRenovation works

All projects →

In-house, not subcontracted

The trades
we own.

Six in-house verticals and three group companies mean the people on your site answer to the same management.

V-01

Civil

Foundations, RC frames, blockwork, plaster, screeds and hardscape.

V-02

MEP

HVAC, plumbing, drainage, electrical and fire-fighting.

V-03

Aluminium, glass & ACP

Licensed workshop in Al Jurf Industrial 2: curtain wall, windows, cladding, pergolas.

V-04

Interiors & fit-out

Gypsum, ceilings, flooring, partitions, paint and finishes.

V-05

ELV

Data, CCTV, access control, AV and BMS integration.

V-06

Maintenance

Post-handover maintenance contracts and minor works.

Group

Smart Sense

ELV, security, CCTV and audio-visual systems. Ajman Police approved.

Group

Whitesand Interiors

Joinery and interior fit-outs: kitchens, wardrobes, wall panelling, reception desks.

Group

Luxera

Premium furniture and upholstery for villas, hotels and offices.

Build style

The standard
we build to

The standard we build to, inside and out, from structure to the last finish.

Contemporary villa at dusk
VillasContemporary villa at dusk
Logistics warehouse with docks
WarehousesLogistics warehouse with docks
Showroom with curtain wall
CommercialShowroom with curtain wall
Event hangar at night
EventsEvent hangar at night
FAQ Questions owners ask

Straight answers

What does a turnkey contractor do in the UAE?

A turnkey contractor takes full responsibility for a building from design coordination and authority approvals through structure, MEP, façade, finishes and handover. The owner signs one contract and receives a completed, tested building ready to occupy.

Which emirates does FAIRWAYS work in?

We are based in Ajman with a branch in Ras Al Khaimah and have delivered projects in Ajman, Sharjah, Dubai, Abu Dhabi, Ras Al Khaimah and Fujairah.

Do you build in concrete or steel (PEB)?

Both. Villas and G+4 blocks are usually reinforced concrete. Warehouses, cold stores and large-span commercial buildings are usually pre-engineered steel. We advise on the option that fits your budget, programme and use.

How long does a turnkey project take?

Indicative programmes: villas 9–14 months, PEB warehouses 5–9 months, G+4 buildings 14–22 months, renovations 3–8 months. Approvals and scope changes are the biggest variables.

Are you ISO certified?

Yes. FAIRWAYS holds ISO 9001 (quality), ISO 14001 (environment) and ISO 45001 (occupational health and safety).

How do I get a quotation?

Send your plot details, drawings or a short brief through the contact page or to sales@fairwaysuae.com. We reply with scope, programme and a priced proposal.

Last updated ·

Have a plot, drawings or just an idea?

Send it. We come back with scope, programme and a priced proposal.

Request a quote →