FAIRWAYS Building Contracting
How we deliver

On programme.
On budget.
On spec.

Project management is not a department at FAIRWAYS. It is how every stage is released, checked and reported, from the first site visit to the day you take the keys.

Stage gates and the four controls
Stages
7 with 6 gates
Controls
Time · cost · quality · HSE
Reporting
Daily · weekly · monthly
Certified
ISO 9001 · 14001 · 45001
Quick answer

FAIRWAYS manages every turnkey project through seven stages separated by six gates. At each gate the programme, cost, quality records and safety record are reviewed before the next stage is released, and the client receives daily, weekly and monthly reports against a baseline programme and budget.

Most construction disputes start with surprises: a late material, a variation nobody priced, a defect found after the ceiling is closed. Our job is to find those things early, on paper, while they are cheap to fix.

That is why the same project team runs your project from design to handover, and why you always know where it stands.

Gate by gate

What we control,
what you receive

Every gate has a defined check and a defined output for the client.

StageWhat we controlWhat you receive
BriefScope, budget, programme targetsSigned brief and budget envelope
DesignCoordinated drawings, clash checks, value engineeringDesign freeze and priced BOQ
ApprovalsSubmissions, comments, permitsPermit and NOC register
StructureConcrete, steel and survey checksInspection records, cube and test results
MEP & envelopeInstallation and pressure tests, façade inspectionsTest certificates, material approvals
FinishesFinish samples, snag walksSnag list closed out
HandoverCommissioning, authority inspectionsAs-built drawings, O&M manuals, warranties
Balance

Time, cost and quality,
held together

Risks pull every project off balance: a late delivery, a design change, a piece of rework. Each corner of the triangle has its own controls, and they work together to bring the project back to the centre without trading one for another.

Risks and the controls that answer them
Programme

Baseline, look-ahead,
progress

A resource-loaded baseline programme is agreed before mobilisation. Each week the site team plans three weeks ahead and reports progress against the baseline. The critical path is visible to you at all times.

Progress tracked against the baseline
Coordination

Clashes solved
on the drawings

Architectural, structural and MEP drawings are overlaid and checked before work starts. A duct that hits a beam is moved on paper in an hour instead of on site in a week.

Design coordination before construction
Reporting

You always know
where it stands

Reports follow a fixed rhythm. Daily records from site, weekly progress meetings with a three-week look-ahead, and a monthly report covering progress, cost, quality and safety.

Daily, weekly and monthly controls
The team

Who runs
your project

One team from design to handover, with clear roles.

PM.1

Project manager

Your single point of contact. Owns the programme, the budget and the reporting.

PM.2

Planner & quantity surveyor

Baseline programme, look-aheads, BOQ, cost reports and variation pricing.

PM.3

Site engineers

Run each trade on site to the approved drawings and method statements.

PM.4

QA/QC engineer

Inspection and test plans, material approvals, non-conformance control.

PM.5

HSE officer

Risk assessments, permits to work, toolbox talks and site audits.

PM.6

Design coordinator

Coordinated drawings, RFIs, submittals and clash resolution.

Project control on site

Where the plan
meets the site

The standard we build to, inside and out, from structure to the last finish.

Weekly progress meeting with the client team
ReportingWeekly progress meeting with the client team
MEP inspected before the ceiling closes
QualityMEP inspected before the ceiling closes
Façade installation under supervision
EnvelopeFaçade installation under supervision
FAQ Questions owners ask

Straight answers

How do you keep a construction project on schedule?

Against a baseline programme agreed before mobilisation, a three-week look-ahead updated every week, early ordering of long-lead materials and a stage-gate review before each new stage begins.

What reports will I receive?

Daily site records on request, a weekly progress meeting with minutes and look-ahead, and a monthly report covering progress against the programme, cost, quality and safety.

How are changes and variations handled?

Every change is priced and its effect on the programme stated in writing before work starts. Nothing is built as a variation without your approval.

Who is my point of contact?

One project manager from design to handover, supported by a planner, quantity surveyor, site engineers, QA/QC and HSE.

How do you control quality?

Through inspection and test plans, material approvals and documented inspections at every stage, under our ISO 9001 quality management system.

Last updated ·

Want to see how your project would run?

Send your brief. Your proposal includes a programme with milestones and the reporting you will receive.