Quick answer

Turnkey construction means one contractor delivers the whole building, from design coordination and approvals to a finished, tested and furnished handover. FAIRWAYS has delivered turnkey projects since 2014, the largest being 35,000 m² in 2025.

Turnkey means you deal with one company. We coordinate the design, take the drawings through municipality and Civil Defence, build the structure, install every service, close the envelope, finish the interiors and hand over a tested building with as-built drawings and warranties.

Because the trades are ours, the programme is ours too. There is no waiting for a façade subcontractor to mobilise or for an MEP firm to finish another job.

What one contract covers

  • Design coordination and value engineering
  • Authority approvals and NOCs
  • Civil and structural works
  • MEP: HVAC, plumbing, electrical, fire
  • Aluminium, glazing and ACP cladding
  • Interiors, joinery and furniture
  • ELV, CCTV, access and AV
  • Testing, commissioning and handover
Why one contract

Every hand-off
removed

With split contracts the owner manages the gaps between civil, MEP, façade, fit-out and furniture contractors. With turnkey, those interfaces are ours to manage, and you deal with one team.

Split contracts vs one turnkey contract
Stage gates

Checked before
every next step

Programme, cost, quality and safety are reviewed at each gate before the next stage is released. You receive the evidence, not just the assurance.

How we deliver →

Stage gates and the four controls
The sequence

From plot to keys

Seven stages, one programme.

  1. Brief & site

    Use, budget, timeline, soil investigation.

  2. Design & BOQ

    Coordinated drawings, priced bill of quantities.

  3. Approvals

    Municipality, Civil Defence, utilities.

  4. Structure

    Foundations, frame, slabs or steel.

  5. MEP & envelope

    Services, façade, roof.

  6. Finishes

    Interiors, joinery, ELV, furniture.

  7. Handover

    Commissioning, snag closure, warranties.

Concrete or steel

Choosing the
structure

We build both and recommend the one that suits your use, budget and programme.

Cast-in-place columns, beams and slabs with block infill. The default for villas and multi-storey residential, and for any building that needs high fire rating, acoustic separation between units, or heavy floor loads.

  • Best for villas, G+1 to G+4 blocks
  • High thermal mass, quiet floors
  • Longer frame programme: about 2–3 weeks per floor
  • Easy to alter and extend later
Programmes

How long it takes

Indicative durations from mobilisation to handover. Your programme is fixed in the proposal.

BuildingStructureTypical durationWhat drives it
Villa, G+1, 400–800 m²Concrete frame9–14 monthsDesign approvals add 6–10 weeks before mobilisation
Warehouse, 2,000–10,000 m²PEB steel5–9 monthsSteel fabrication runs in parallel with foundations
Cold store, 1,000–5,000 m²PEB + insulated panel6–10 monthsRefrigeration commissioning adds 4–6 weeks
Commercial building, G+1 to G+2Concrete or PEB8–14 monthsCurtain wall and ACP from our own workshop
G+4 residential or mixed useConcrete frame14–22 monthsCivil Defence and utility NOCs set the end date
Full renovation, 500–3,000 m²Existing structure3–8 monthsOccupied buildings are phased floor by floor
Event site, 10,000–100,000 m²Temporary structuresHours to multi-dayBuild and strike windows planned to the hour
Handover standard

Finished to the last detail

We hand over when the building is complete, tested and clean, not when the structure is up.

FAQ Questions owners ask

Straight answers

What is the difference between turnkey and design-and-build?

Design-and-build means one company designs and constructs. Turnkey goes further: the contractor also delivers the finishes, systems and often furniture, so the building is ready to use on handover. FAIRWAYS delivers both models.

Can you work with my own architect?

Yes. Many clients bring an appointed consultant. We build to their drawings and coordinate the trades, or we can take over design development where the drawings stop.

Do you handle municipality and Civil Defence approvals?

Yes. Approvals are part of the turnkey scope, including building permits, Civil Defence fire approvals and utility connections.

How is a turnkey contract priced?

Usually as a lump sum against an agreed scope and BOQ, with stage payments tied to progress milestones. Provisional sums are used for items the client has not yet selected.

What happens after handover?

You receive as-built drawings, O&M manuals and warranties. Our maintenance vertical can take on a post-handover maintenance contract.