One contract from plot to keys. Design, approvals, structure, MEP, façade, interiors and handover by our own teams.
- Since
- 2014 turnkey
- Largest
- 35,000 m²
- Systems
- Concrete · PEB · hybrid
- Certified
- ISO 9001 · 14001 · 45001
Turnkey construction means one contractor delivers the whole building, from design coordination and approvals to a finished, tested and furnished handover. FAIRWAYS has delivered turnkey projects since 2014, the largest being 35,000 m² in 2025.
Turnkey means you deal with one company. We coordinate the design, take the drawings through municipality and Civil Defence, build the structure, install every service, close the envelope, finish the interiors and hand over a tested building with as-built drawings and warranties.
Because the trades are ours, the programme is ours too. There is no waiting for a façade subcontractor to mobilise or for an MEP firm to finish another job.
What one contract covers
- Design coordination and value engineering
- Authority approvals and NOCs
- Civil and structural works
- MEP: HVAC, plumbing, electrical, fire
- Aluminium, glazing and ACP cladding
- Interiors, joinery and furniture
- ELV, CCTV, access and AV
- Testing, commissioning and handover
Every hand-off
removed
With split contracts the owner manages the gaps between civil, MEP, façade, fit-out and furniture contractors. With turnkey, those interfaces are ours to manage, and you deal with one team.
Checked before
every next step
Programme, cost, quality and safety are reviewed at each gate before the next stage is released. You receive the evidence, not just the assurance.
From plot to keys
Seven stages, one programme.
Brief & site
Use, budget, timeline, soil investigation.
Design & BOQ
Coordinated drawings, priced bill of quantities.
Approvals
Municipality, Civil Defence, utilities.
Structure
Foundations, frame, slabs or steel.
MEP & envelope
Services, façade, roof.
Finishes
Interiors, joinery, ELV, furniture.
Handover
Commissioning, snag closure, warranties.
Choosing the
structure
We build both and recommend the one that suits your use, budget and programme.
Cast-in-place columns, beams and slabs with block infill. The default for villas and multi-storey residential, and for any building that needs high fire rating, acoustic separation between units, or heavy floor loads.
- Best for villas, G+1 to G+4 blocks
- High thermal mass, quiet floors
- Longer frame programme: about 2–3 weeks per floor
- Easy to alter and extend later
Factory-fabricated steel portal frames bolted on site over concrete foundations, clad in insulated sandwich panel. Spans of 30–60 m without internal columns.
- Best for warehouses, cold stores, showrooms, event halls
- Fabrication runs while foundations are poured
- Erection of a 10,000 m² shed in weeks, not months
- Lower cost per m² at large spans
Concrete where you need it, steel where you need span: a concrete office and amenity block wrapped around a steel warehouse, or a concrete podium with a light steel roof structure.
- Best for mixed-use industrial and supermarkets
- Office block in concrete, shed in steel
- One programme, one structural engineer
How long it takes
Indicative durations from mobilisation to handover. Your programme is fixed in the proposal.
| Building | Structure | Typical duration | What drives it |
|---|---|---|---|
| Villa, G+1, 400–800 m² | Concrete frame | 9–14 months | Design approvals add 6–10 weeks before mobilisation |
| Warehouse, 2,000–10,000 m² | PEB steel | 5–9 months | Steel fabrication runs in parallel with foundations |
| Cold store, 1,000–5,000 m² | PEB + insulated panel | 6–10 months | Refrigeration commissioning adds 4–6 weeks |
| Commercial building, G+1 to G+2 | Concrete or PEB | 8–14 months | Curtain wall and ACP from our own workshop |
| G+4 residential or mixed use | Concrete frame | 14–22 months | Civil Defence and utility NOCs set the end date |
| Full renovation, 500–3,000 m² | Existing structure | 3–8 months | Occupied buildings are phased floor by floor |
| Event site, 10,000–100,000 m² | Temporary structures | Hours to multi-day | Build and strike windows planned to the hour |
Finished to the last detail
We hand over when the building is complete, tested and clean, not when the structure is up.
Straight answers
What is the difference between turnkey and design-and-build?
Design-and-build means one company designs and constructs. Turnkey goes further: the contractor also delivers the finishes, systems and often furniture, so the building is ready to use on handover. FAIRWAYS delivers both models.
Can you work with my own architect?
Yes. Many clients bring an appointed consultant. We build to their drawings and coordinate the trades, or we can take over design development where the drawings stop.
Do you handle municipality and Civil Defence approvals?
Yes. Approvals are part of the turnkey scope, including building permits, Civil Defence fire approvals and utility connections.
How is a turnkey contract priced?
Usually as a lump sum against an agreed scope and BOQ, with stage payments tied to progress milestones. Provisional sums are used for items the client has not yet selected.
What happens after handover?
You receive as-built drawings, O&M manuals and warranties. Our maintenance vertical can take on a post-handover maintenance contract.
Last updated ·
Have a plot, drawings or just an idea?
Send it. We come back with scope, programme and a priced proposal.