Villa
construction
Private villas from G to G+2, built plot to keys by one team, interiors and furniture included.
- Typical size
- 400–1,200 m²
- Structure
- RC frame
- Programme
- 9–14 months
- Includes
- Pool · landscape · joinery
FAIRWAYS builds private villas across the UAE as a single turnkey contract: structure, MEP, aluminium and glazing, interiors, joinery, pools and landscape. A typical G+1 villa takes 9–14 months from permit to handover.
A villa is the most personal building most people will commission. It is also the one most often split between too many contractors. We build the structure, install the services, make the windows and pergolas in our own aluminium workshop, and finish the interiors with our group joinery and furniture companies.
Villa scope
- Soil test, setting out and foundations
- RC frame, block walls, roof waterproofing
- Full MEP, solar-ready, smart-home wiring
- Aluminium windows, sliding doors, ACP pergolas
- Kitchens, wardrobes, wall panelling
- Pool, boundary wall, hardscape and landscape
- Loose furniture and soft furnishing on request
Living rooms that feel finished on day one
Double-height glazing, joinery and lighting planned with the structure, not added afterwards.
Twelve months,
more or less
A G+1 villa of about 600 m² typically runs 9–14 months after permit.
Design
Plans, elevations, structural and MEP drawings.
Permit
Municipality and utility approvals.
Substructure
Excavation, footings, plinth, DPC.
Frame
Columns, slabs, roof, blockwork.
MEP & openings
First fix, windows, waterproofing.
Finishes
Plaster, tiling, joinery, paint.
Externals & keys
Pool, landscape, snag, handover.
Twelve months,
planned to the week
Every villa runs against a baseline programme agreed before mobilisation. The critical path (gold) is tracked weekly and you see progress against the baseline in every report.
Approvals and long-lead items such as windows, joinery and the pool are ordered against this programme, not when the site is ready for them.
How it looks
when we finish
The standard we build to, inside and out, from structure to the last finish.





Straight answers
How much does it cost to build a villa in Ajman or Sharjah?
Cost depends on size, specification and finishes. We price every villa against your drawings and a finish schedule rather than a per-square-metre guess, so the number you sign is the number you pay for that scope.
How long does villa construction take in the UAE?
A typical G+1 villa takes 9–14 months from permit to handover. Design and approvals usually add 6–10 weeks before site work starts.
Can you build from my existing villa drawings?
Yes. We build to approved drawings or develop them with our design partners if they are incomplete.
Do you supply the interiors and furniture too?
Yes. Joinery is made by our group company Whitesand Interiors and furniture is supplied by Luxera, so the interior can be part of the same contract.
Do you build pools and landscaping?
Yes. Pools, boundary walls, hardscape, pergolas and soft landscape are part of our villa scope.
Last updated ·
Have a plot, drawings or just an idea?
Send it. We come back with scope, programme and a priced proposal.
Request a quote →