Renovation

From cold shell to consumer-ready: villas, offices, hotels and retail, occupied or empty.

Typical size
500–3,000 m²
Programme
3–8 months
Live sites
Phased, night shifts
Includes
MEP · façade · joinery
Quick answer

FAIRWAYS carries out complete renovations in the UAE, taking villas, offices, hotels and retail units from bare shell or tired interiors to finished, consumer-ready space. Typical renovations of 500–3,000 m² take 3–8 months, including occupied buildings.

Renovation is harder than new-build: unknown services behind walls, neighbours and tenants to protect, and owners who need the space back fast. We survey first, strip out safely, upgrade the services and rebuild the interior with the same trades we use on new buildings.

Renovation scope

  • Condition survey and as-found drawings
  • Strip-out and safe disposal
  • Structural repairs and waterproofing
  • MEP replacement and upgrades
  • New façade, windows and cladding
  • Full interior, joinery and furniture
  • Authority re-approvals where use changes
Before and after

Cold shell to
consumer-ready

Drag the slider to see the order the trades follow.

Cold shell
Cold shellConsumer-ready
Cold shellBare concrete, exposed services
FlooringEngineered timber floor
Plaster & paintBlock walls plastered and painted
GlazingAluminium frames from our workshop
Ceiling & lightBulkheads, cove light, AC grilles
JoineryKitchen joinery and slat wall
FurnitureSofa, tables and styling
Lights onEvening mood: cove and pendants
Live renovation

Open for business while we work

Hotels, malls and offices renovated in phases with hoarding, dust control and night shifts. BurJuman Centre and Atlantis Dubai are on our record.

Renovation types

What we renovate

06.1

Villas

Full gut-and-refit, extensions, kitchens, bathrooms and façades.

06.2

Offices

Cat A to Cat B, reconfiguration and workplace upgrades.

06.3

Hotels

Lobbies, restaurants and guest floors, phased.

06.4

Retail & malls

Store refits and mall common areas at night.

06.5

Industrial

Roof replacement, drainage remediation, new bays.

06.6

MEP replacement

Steam, chilled water and electrical replacement in live buildings.

Occupied buildings

Tenants stay,
works move

Most renovations happen around people. We hoard one zone, renovate it, hand it back and move on, with agreed working hours, noise limits and protected routes for occupants.

Floor-by-floor phasing
Before and after

How it looks
when we finish

The standard we build to, inside and out, from structure to the last finish.

Bare shell: exposed services, block walls, raw slab
Before · Cold shellBare shell: exposed services, block walls, raw slab
The same space finished and furnished
After · Consumer-readyThe same space finished and furnished
Hotel lobby renovation
Hospitality · LobbyHotel lobby renovation
Renovated hotel guest room
Hospitality · Guest roomRenovated hotel guest room
Office floor refurbished from Cat A to Cat B
Workplace · OfficeOffice floor refurbished from Cat A to Cat B
Bespoke joinery for refurbished interiors
Workshop · JoineryBespoke joinery for refurbished interiors
FAQ Questions owners ask

Straight answers

How long does a full renovation take?

A complete renovation of 500–3,000 m² typically takes 3–8 months, depending on the condition found, MEP replacement and whether the building stays occupied.

Can you renovate an occupied building?

Yes. We phase works floor by floor or zone by zone and agree working hours, noise limits and access routes with the occupier.

Do I need municipality approval to renovate?

Internal finishes usually need only a fit-out permit; structural changes, façade changes or a change of use need full approvals. We handle the applications.

Do you renovate villas?

Yes. Kitchens, bathrooms, extensions, façades and complete gut-and-refit renovations, including joinery and furniture.

Last updated ·

Have a plot, drawings or just an idea?

Send it. We come back with scope, programme and a priced proposal.